Camus BlueFlame Boiler
Equipment Description
Model: BFNH-0660-2G1
Serial: 060908754
Fuel: Natural Gas
Orifice: #30
Input: 594,000 BTU
Output: 504,000
Min Water Pressure: 30 PSI
Max Water Pressure: 160 PSI
Service and maintenance
1. Visual & External Inspection (Monthly or Every 6 Months)
Inspect cabinet/jacket for damage, corrosion, or leaks.
Check all piping (water, gas) for leaks, corrosion, or damage.
Verify proper water flow (pump running, no air in system).
Ensure clear access for service (burner tray slides out easily).
Check for accumulation of dust, lint, or debris around air inlets.
Inspect relief valve for leaks or discharge; manually test every 6 months.
2. Burner & Ignition System (Every 6 Months or as Needed)
Main Burner Flame Check (every 6 months):
Observe flame: Should be steady blue (natural gas) with minimal lifting, smooth light-off, reasonably quiet operation, and acceptable CO/CO₂ levels.
If yellow tips, lifting, noise, or instability: Check for lint/dirt at burner air inlets → clean as below.
Burner Cleaning Procedure (qualified technician):
Shut off power and close main manual gas valve.
Remove burner tray assembly (slide-out design for easy access).
Vacuum or clean burners (remove lint, dust, scale).
Inspect burners for damage or warping; replace if needed.
Reinstall tray with new gaskets if required (heat-affected gaskets must be replaced).
Test for proper flame after reassembly.
Pilot/Igniter Check & Cleaning (every 6 months or with flame issues):
With gas valve off, cycle ignition to observe spark (must be strong and continuous).
Adjust spark gap to 1/8"–3/16" if needed.
Remove igniter/electrode (after removing burner tray).
Clean with fine sandpaper if fouled with carbon.
Reinstall; tighten pilot line connection.
Light pilot: Flame must be blue and fully engulf ignition sensor/ground plate.
Cycle pilot multiple times for reliability.
Turn main gas on; verify pilot stays lit when main burner fires.
Run boiler 15+ minutes and cycle to confirm stability.
3. Heat Exchanger & Water Side (After First Season, Then Annually or as Needed)
Inspect for scaling, corrosion, or damage (copper tubes/coils).
Listen for pinging/crackling/hissing during operation → immediate shutdown and inspection required (scaling not covered by warranty).
Clean if dirty: Follow detailed venting/heat exchanger procedure in manual Section 6 (typically involves removing access panels, vacuuming flue passages, checking for blockages).
Check inlet water temperature ≥110°F to prevent condensing (warranty void if condensing occurs).
Flush low-water cutoff (float type) every 6 months.
Test system water for hardness/chemistry; treat if needed (consult factory for hard water areas).
Ensure no “Stop Leak” or boiler compounds used.
4. Venting & Combustion Air (Every 6 Months / Annually)
Inspect vent pipe for leaks, corrosion, blockages, or damage.
Verify proper venting per manual (Category I or as installed; follow NFPA 54/CAN/CGA B149).
Check combustion air supply/intake for obstructions, adequate volume, and no contaminants (corrosive chemicals void warranty).
Clean intake screens/filters if present.
Confirm draft/venting supports non-condensing operation.
5. Safety Devices & Controls (Every 6 Months – Mandatory)
Test low-water cutoff, flow switch, high-limit aquastat, and all safety interlocks for proper operation.
Manually operate relief valve(s).
Verify ignition safety shut-off functions correctly (per manual Section on check-out).
Check all electrical connections for tightness/corrosion.
Test pump interlock (circulator must run before burner fires).
For seasonal units: Full functional test of all controls by qualified technician.
6. Gas Supply & Piping (Every 6 Months or Annually)
Check inlet gas pressure: Natural gas 5–7" WC (min/max per manual); do not exceed ½ psi (14" WC) at inlet.
Inspect gas train, valves, and connections for leaks (use soap solution; never open flame).
Verify drip leg/trap is clean and functional.
For 2-stage models (if applicable to -2G1): Check staging operation and pressures at each stage.
Confirm manual shut-off valve and union are accessible.
7. Electrical & General System (Every 6 Months)
Verify 115V supply and grounding.
Check fuses/breakers (15A typical).
Inspect wiring for damage; no splicing recommended.
Test all lights/indicators (power, water flow, etc.).
Ensure pump operates correctly before burner ignition.